Customization: | Available |
---|---|
Capacity: | 30-50kg/ Times (3-6 Times/Day) |
Applicable Hospital Size: | 100-200beds |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Applicable hospital size (number of beds) |
100-200beds |
Burning Ability | 30-50kg/ times (3-6 times/day) |
Size of the Burner |
1.8*1.2*3 m |
Volume of the Burner | Gasification room0.5m3, secondary bumingroom0.3m3,drift a long buming a room0.04m3 |
Size of the filling entrance | 620mm×800mm |
Chimney | Height 5m out-radius300mm |
Blower | 0.5kw |
Combustion-support combustion machines | 0.11kw,fuelconsumption4-10kg/h |
Re-burning machine | 0.11kw,fuelconsumption10-15kg/h |
Running voltage | 220V |
Weight | About 4500kg |